Let the route follow the building.
Use the 45° fitting for the planned offset or shallow turn. Check the complete footprint with nearby pipework, cables and other services before assembly.
Recent
Clear
Choose the matching option for your route. Guide ventilation ducting around the building layout with a BlauTHERM 45° bend. The lightweight EPP fitting continues the insulated air path through a shallower change of direction, with matching connections for the adjoining duct lengths.
BlauTHERM
Guide ventilation ducting around the building layout with a BlauTHERM 45° bend. The lightweight EPP fitting continues the insulated air path through a shallower change of direction, with matching connections for the adjoining duct lengths.

Make the 45° insulated bend part of a complete, planned installation.
Use the 45° fitting for the planned offset or shallow turn. Check the complete footprint with nearby pipework, cables and other services before assembly.
The expanded polypropylene body forms part of the matching insulated system, helping you build the change of direction with ducting and insulation handled together.
Choose the actual angle required by the planned route.
Continue the EPP air path through the fitting.
Select 125mm, 160mm or 200mm to suit the adjoining duct.
Arrange the bend and measured lengths before final assembly.
Fully seat clean matching connections.
Plan the bend alongside couplers, supports and the other required fittings.
Choose the 45° insulated bend for the route and connection arrangement specified for your installation.

Plan this 45° insulated bend alongside the main duct layout, equipment connections and commissioning requirements.
Select the fitting or support for the designed conditioned-air route, checking the connections and available installation space.
Coordinate the component with a suitable extract route and provide the support, sealing and access needed for the finished installation.
Choose the option that matches the connected components and route design.
Available option
45° insulated bend
BTIDB-45-125
Available option
45° insulated bend
BTIDB-45-160
Available option
45° insulated bend
BTIDB-45-200
Plan a matching connector at each 1m duct joint, plus any additional connections needed around the bend and cut sections.
Check the angle, nominal size and full installed footprint alongside the airflow design.

Confirm that a 45° turn is required and match the nominal diameter to the adjoining ductwork.
Check the bend footprint, connection engagement and clearance from other services before measuring adjoining lengths.
Keep mating surfaces clean and push matching components fully home. Use BTG-500 EPP adhesive where extra strength and rigidity are required.
Support the completed route and include bends in the system airflow and pressure-loss design. Check the finished installation during commissioning.
Check these details alongside the route design, actual components and fitting instructions.
Choose it where the planned duct route needs a 45° change of direction. Check the fitting footprint and system design before ordering.
The fittings make different changes of direction. This is the 45° bend; select the angle that matches the actual route.
Choose the same nominal BlauTHERM size as the adjoining ductwork: 125mm, 160mm or 200mm.
Its EPP body forms part of the matching insulated ducting system. Fully assemble the joints and maintain the insulation and sealing required by the installation design.
Dry-position the full fitting and adjoining connections alongside nearby services. Check assembly space and supports before finalising the route.
Include the bend and the other route components in the ventilation system design. Select and commission the system against its required airflow.
Measure the required section and make a square, clean cut with a sharp knife. Allow for joint engagement and a matching connector at each required joint.
Fully seat clean matching connections, add BTG-500 EPP adhesive where extra joint rigidity is required, and provide suitable supports for the ductwork.