BlauTHERM Insulated EPP MVHR Ventilation Ducting Beam Adaptor

In stock
SKU
BTIDBA-CON
As low as £70.06 £58.38
Selected SKU: %1
Availability: %1

Choose the matching option for your route. Coordinate ventilation ducting with beams and nearby services using a BlauTHERM insulated beam adaptor. Its shaped EPP body links matching circular connections while helping the installer plan the route within the available space.

  • Shaped route component: A dedicated adaptor for coordinating around beams and services.
  • Built-in EPP insulation: Continue the matching insulated air path through the fitting.
  • Matching circular ends: Choose the nominal size required by the adjoining ductwork.
  • Three nominal sizes: 125mm, 160mm and 200mm options.
  • Light to position: Dry-position the full adaptor before measuring adjacent lengths.

BlauTHERM

Plan the route around the structure.

Coordinate ventilation ducting with beams and nearby services using a BlauTHERM insulated beam adaptor. Its shaped EPP body links matching circular connections while helping the installer plan the route within the available space.

CONNECTION OPTION
125mm / 160mm / 200mm
COMPONENT
Insulated beam adaptor
BlauTHERM insulated EPP beam adaptor with circular duct connections

Fit the route to the building.

Make the insulated beam adaptor part of a complete, planned installation.

Coordinate the services before they meet.

Plan the adaptor alongside the building structure, pipework, cables and other duct routes. Check the full footprint before the surrounding work is closed in.

Keep the route within the insulated range.

The EPP adaptor connects matching circular ductwork. Select the nominal size for the adjoining route and check assembly space at both ends.

Shaped route component

A dedicated adaptor for coordinating around beams and services.

Built-in EPP insulation

Continue the matching insulated air path through the fitting.

Matching circular ends

Choose the nominal size required by the adjoining ductwork.

Three nominal sizes

125mm, 160mm and 200mm options.

Light to position

Dry-position the full adaptor before measuring adjacent lengths.

Plan with other services

Check access, assembly clearance and suitable support positions.

Put it to work on your project.

Choose the insulated beam adaptor for the route and connection arrangement specified for your installation.

BlauTHERM insulated ductwork with matching joints and supports in an installation
BlauTHERM ductwork, matching joints and supports in an installation.

MVHR heat recovery

Plan this insulated beam adaptor alongside the main duct layout, equipment connections and commissioning requirements.

Air conditioning

Select the fitting or support for the designed conditioned-air route, checking the connections and available installation space.

Extract ventilation

Coordinate the component with a suitable extract route and provide the support, sealing and access needed for the finished installation.

Match the connection to your route.

Choose the option that matches the connected components and route design.

125mm

Available option
Insulated beam adaptor

BTIDBA-125

160mm

Available option
Insulated beam adaptor

BTIDBA-160

200mm

Available option
Insulated beam adaptor

BTIDBA-200

Check the actual clearance and connection arrangement. The adaptor does not provide approval to cut, drill or modify structural beams.

Check the full footprint before the final fit.

Coordinate the actual adaptor shape with the structure and the adjoining services.

BlauTHERM shaped beam adaptor showing its full footprint and circular connection
Check the complete adaptor footprint and both connection positions before installation.
  1. Confirm size and space.

    Choose the nominal duct size and check the full adaptor footprint and connection positions.

  2. Dry-position the assembly.

    Place the adaptor alongside the adjoining lengths and nearby services before completing the route.

  3. Make the matching joints.

    Clean and fully seat compatible push-fit connections. Use BTG-500 EPP adhesive where added joint rigidity is required.

  4. Support the finished route.

    Provide suitable support and maintain any servicing access needed around the completed installation.

The details for your installation.

Check these details alongside the route design, actual components and fitting instructions.

Connection option
125mm / 160mm / 200mm
Purpose
Coordinate duct route around beams and services
Material
Expanded polypropylene (EPP)
Connections
Matching circular push-fit connections
Planning check
Full footprint and connection clearance
Available product codes
BTIDBA-125 / BTIDBA-160 / BTIDBA-200
Product code
BTIDBA-CON

Your insulated beam adaptor questions, answered.

What is the beam adaptor designed to do?

It is a shaped fitting for coordinating a matching circular duct route around the building structure and surrounding services.

Which size should I choose?

Match the nominal 125mm, 160mm or 200mm size to the adjoining BlauTHERM ductwork.

What dimensions should I check before installing?

Check the actual adaptor footprint, connection positions and available clearance against the supplied dimensional information and installation.

Does this allow a structural beam to be cut?

The adaptor is a duct-route component. Any structural alteration requires its own approved design; this fitting does not authorise cutting or drilling beams.

Does the adaptor continue the insulated system?

Its EPP body forms part of the matching insulated ducting range. Fully assemble the joints and maintain the required sealing and insulation.

Can the surrounding duct lengths be cut to suit?

Measure the actual route and allow for joint engagement before cutting square, clean lengths. Plan the matching connectors required for the joints.

When should the adaptor be positioned?

Dry-position it with the adjoining lengths and other services before completing the joints or closing surrounding construction.

How should the adaptor assembly be secured?

Fully seat clean matching joints, add BTG-500 EPP adhesive where extra strength and rigidity are required and support the completed ductwork suitably.

© 2025 Blauberg UK Ltd. All rights reserved.