BlauTHERM Insulated MVHR Ventilation Ducting Reducer

In stock
SKU
BTIDR-CON
As low as £12.65 £10.54
Selected SKU: %1
Availability: %1

Match both sides of your insulated ventilation ducting connection. In the diameter selector, choose 125mm for 160mm to 125mm, 150mm for 200mm to 150mm, or 160mm for 200mm to 160mm. Each BlauTHERM EPP reducer is one specific transition.

  • Defined size pairs: Choose the exact transition rather than one diameter alone.
  • Insulated EPP body: Keep built-in insulation through the size change.
  • Compact route planning: Check the complete transition footprint before fitting.
  • Matching joints: Confirm compatibility at both ends before assembly.
  • Light to position: Dry-position the reducer with the adjoining components.

BlauTHERM

Change size. Keep the route connected.

Make a planned change of duct diameter with a BlauTHERM EPP reducer. Choose the connection size at both ends, then continue the insulated route between matching ductwork or compatible equipment connections.

CONNECTION OPTION
160mm to 125mm / 200mm to 150mm / 200mm to 160mm
COMPONENT
Insulated EPP reducer
Single BlauTHERM insulated EPP circular duct reducer

Make the size change with confidence.

Make the insulated EPP reducer part of a complete, planned installation.

Order the transition your route needs.

Select 160mm to 125mm, 200mm to 150mm or 200mm to 160mm. The two sizes matter together: check both adjoining connections before ordering.

Continue the insulated air path.

The EPP body keeps the transition within the matching insulated system. Plan the size change alongside airflow, available pressure and the equipment connection.

Defined size pairs

Choose the exact transition rather than one diameter alone.

Insulated EPP body

Keep built-in insulation through the size change.

Compact route planning

Check the complete transition footprint before fitting.

Matching joints

Confirm compatibility at both ends before assembly.

Light to position

Dry-position the reducer with the adjoining components.

Design-led selection

Check the change of size against airflow and pressure requirements.

Put it to work on your project.

Choose the insulated EPP reducer for the route and connection arrangement specified for your installation.

BlauTHERM insulated ductwork with matching joints and supports in an installation
BlauTHERM ductwork, matching joints and supports in an installation.

MVHR heat recovery

Plan this insulated EPP reducer alongside the main duct layout, equipment connections and commissioning requirements.

Air conditioning

Select the fitting or support for the designed conditioned-air route, checking the connections and available installation space.

Extract ventilation

Coordinate the component with a suitable extract route and provide the support, sealing and access needed for the finished installation.

Match the connection to your route.

The diameter selector names the smaller connection: choose 125mm for 160mm to 125mm, 150mm for 200mm to 150mm, or 160mm for 200mm to 160mm. Check both adjoining connections before ordering.

160mm to 125mm

Available option
Insulated EPP reducer

BTIDR-160-125

200mm to 150mm

Available option
Insulated EPP reducer

BTIDR-200-150

200mm to 160mm

Available option
Insulated EPP reducer

BTIDR-200-160

Check the actual joint arrangement and the outside dimensions of insulated components, especially at equipment connections.

Check both ends before you connect.

Confirm the complete size pair and the connection arrangement for each adjoining component.

BlauTHERM single EPP reducer showing the two different circular connection sizes
Check both nominal connection sizes against the adjoining components.
  1. Confirm the transition.

    Match both nominal sizes to the equipment and ductwork. The 200mm-to-150mm option has a 150mm smaller connection.

  2. Check the system design.

    Allow for the size change in the airflow and pressure-loss design and check space for assembly and support.

  3. Assemble compatible joints.

    Align clean matching connections and fully seat them. Use BTG-500 EPP adhesive where extra EPP joint strength and rigidity are required.

  4. Support and check.

    Support the connected route and maintain the insulation and sealing required by the installation design.

The details for your installation.

Check these details alongside the route design, actual components and fitting instructions.

Connection option
160mm to 125mm / 200mm to 150mm / 200mm to 160mm
Product type
Insulated circular size transition
Material
Expanded polypropylene (EPP)
Connections
Check compatibility at both ends
Use
Designed change between nominal duct sizes
Available product codes
BTIDR-160-125 / BTIDR-200-150 / BTIDR-200-160
Product code
BTIDR-CON

Your insulated EPP reducer questions, answered.

How do the diameter choices match the reducer sizes?

The selector uses the smaller connection diameter. The 125mm choice is a 160mm-to-125mm reducer; 150mm is 200mm to 150mm; and 160mm is 200mm to 160mm. Select the complete transition needed for your route.

Is the smaller connection on BTIDR-200-150 150mm?

Yes. That transition is 200mm to 150mm. The separate BTIDR-200-160 option changes from 200mm to 160mm.

What should I measure before choosing a reducer?

Check both nominal connection sizes, the actual mating arrangement and the available space around the insulated components.

Does a reducer maintain the EPP insulated system?

The EPP body forms part of the matching insulated ducting range. Complete the joints and maintain insulation and sealing as required by the design.

Can a reducer be selected only from the fan spigot size?

Check both the equipment connection and the adjoining duct route. Confirm compatibility and the required size pair before assembly.

Does changing diameter affect the ventilation design?

Include the transition in the system airflow and pressure-loss assessment. Choose sizes against the required duty rather than installation space alone.

Can one reducer cover all three transitions?

Each listed reducer is a specific size pair. Choose the exact option needed for your route.

How should the transition be supported?

Support the adjoining ductwork so the joint does not carry an unsupported run. Fully assemble compatible connections and use suitable jointing materials.

© 2025 Blauberg UK Ltd. All rights reserved.