Order the transition your route needs.
Select 160mm to 125mm, 200mm to 150mm or 200mm to 160mm. The two sizes matter together: check both adjoining connections before ordering.
Recent
Clear
Match both sides of your insulated ventilation ducting connection. In the diameter selector, choose 125mm for 160mm to 125mm, 150mm for 200mm to 150mm, or 160mm for 200mm to 160mm. Each BlauTHERM EPP reducer is one specific transition.
BlauTHERM
Make a planned change of duct diameter with a BlauTHERM EPP reducer. Choose the connection size at both ends, then continue the insulated route between matching ductwork or compatible equipment connections.

Make the insulated EPP reducer part of a complete, planned installation.
Select 160mm to 125mm, 200mm to 150mm or 200mm to 160mm. The two sizes matter together: check both adjoining connections before ordering.
The EPP body keeps the transition within the matching insulated system. Plan the size change alongside airflow, available pressure and the equipment connection.
Choose the exact transition rather than one diameter alone.
Keep built-in insulation through the size change.
Check the complete transition footprint before fitting.
Confirm compatibility at both ends before assembly.
Dry-position the reducer with the adjoining components.
Check the change of size against airflow and pressure requirements.
Choose the insulated EPP reducer for the route and connection arrangement specified for your installation.

Plan this insulated EPP reducer alongside the main duct layout, equipment connections and commissioning requirements.
Select the fitting or support for the designed conditioned-air route, checking the connections and available installation space.
Coordinate the component with a suitable extract route and provide the support, sealing and access needed for the finished installation.
The diameter selector names the smaller connection: choose 125mm for 160mm to 125mm, 150mm for 200mm to 150mm, or 160mm for 200mm to 160mm. Check both adjoining connections before ordering.
Available option
Insulated EPP reducer
BTIDR-160-125
Available option
Insulated EPP reducer
BTIDR-200-150
Available option
Insulated EPP reducer
BTIDR-200-160
Check the actual joint arrangement and the outside dimensions of insulated components, especially at equipment connections.
Confirm the complete size pair and the connection arrangement for each adjoining component.

Match both nominal sizes to the equipment and ductwork. The 200mm-to-150mm option has a 150mm smaller connection.
Allow for the size change in the airflow and pressure-loss design and check space for assembly and support.
Align clean matching connections and fully seat them. Use BTG-500 EPP adhesive where extra EPP joint strength and rigidity are required.
Support the connected route and maintain the insulation and sealing required by the installation design.
Check these details alongside the route design, actual components and fitting instructions.
The selector uses the smaller connection diameter. The 125mm choice is a 160mm-to-125mm reducer; 150mm is 200mm to 150mm; and 160mm is 200mm to 160mm. Select the complete transition needed for your route.
Yes. That transition is 200mm to 150mm. The separate BTIDR-200-160 option changes from 200mm to 160mm.
Check both nominal connection sizes, the actual mating arrangement and the available space around the insulated components.
The EPP body forms part of the matching insulated ducting range. Complete the joints and maintain insulation and sealing as required by the design.
Check both the equipment connection and the adjoining duct route. Confirm compatibility and the required size pair before assembly.
Include the transition in the system airflow and pressure-loss assessment. Choose sizes against the required duty rather than installation space alone.
Each listed reducer is a specific size pair. Choose the exact option needed for your route.
Support the adjoining ductwork so the joint does not carry an unsupported run. Fully assemble compatible connections and use suitable jointing materials.