Set the airflow to suit the room.
The control handle provides manual adjustment where the ventilation design calls for balancing. Measure the delivered airflow and set the damper during commissioning.
Recent
Clear
Choose the matching option for your route. Fine-tune the air path during commissioning with a BlauTHERM manual balancing damper. Its external control lets you adjust the airflow within a matching insulated duct route, helping the installer bring each planned run into balance.
BlauTHERM
Fine-tune the air path during commissioning with a BlauTHERM manual balancing damper. Its external control lets you adjust the airflow within a matching insulated duct route, helping the installer bring each planned run into balance.

Make the manual balancing damper part of a complete, planned installation.
The control handle provides manual adjustment where the ventilation design calls for balancing. Measure the delivered airflow and set the damper during commissioning.
The EPP body coordinates with matching BlauTHERM ducting. Plan the damper position with enough room to assemble the joints and reach the control after installation.
Reach the external handle without opening the duct joint.
Adjust against measured airflow and the system design.
Continue the insulated system through the control position.
Match 125mm, 160mm or 200mm to the connected route.
Join clean, matching components and seat them fully.
Keep the control available when ceilings and boxing are finished.
Choose the manual balancing damper for the route and connection arrangement specified for your installation.

Plan this manual balancing damper alongside the main duct layout, equipment connections and commissioning requirements.
Select the fitting or support for the designed conditioned-air route, checking the connections and available installation space.
Coordinate the component with a suitable extract route and provide the support, sealing and access needed for the finished installation.
Choose the option that matches the connected components and route design.
Available option
Manual balancing damper
BTIDD-125
Available option
Manual balancing damper
BTIDD-160
Available option
Manual balancing damper
BTIDD-200
Plan access to the handle as part of the finished installation. The handle position alone does not confirm the delivered airflow.
Set the position before completing the route, then measure and balance the airflow during commissioning.

Choose the nominal duct size and the airflow-control position specified for the route.
Dry-position the damper and check the adjustment clearance before closing the ceiling or boxing.
Assemble clean matching push-fit joints fully. Use BTG-500 EPP adhesive where added joint rigidity is required and support the ductwork.
Set the airflow using the external control during commissioning. Recheck the connected system after adjustment.
Check these details alongside the route design, actual components and fitting instructions.
It provides manual airflow adjustment within the duct route. Use it where the ventilation design calls for balancing, and measure the airflow during commissioning.
Match the damper to the adjoining 125mm, 160mm or 200mm BlauTHERM ductwork and the system design.
Plan an accessible control position. The handle must remain reachable for commissioning and later adjustment once the ceiling or boxing is complete.
Measure the delivered airflow rather than relying on a handle position alone. Adjust and recheck the system against the design.
This listing is for a manual balancing damper with an external adjustment handle.
Use it on a suitable MVHR route where the ventilation design calls for manual balancing. Confirm the diameter, position and commissioning requirements.
Align clean, matching components and push the joints fully home. Use BTG-500 EPP adhesive where extra joint strength and rigidity are required.
Allow for the insulated body, joint engagement, support positions and hand clearance at the control, alongside any servicing access required by the equipment.