Keep the insulated route connected.
The EPP coupler continues the matching insulated ducting system through the connection. Fully seated joints and the sealing required by the design help you complete the air path with care.
Recent
Clear
A 125mm nominal EPP coupler for joining BlauTHERM insulated ventilation ducting and fittings, including sections cut to suit the installation.
BlauTHERM
Complete your 125mm insulated duct route with a matching EPP coupler. Join straight lengths and reconnect sections cut to suit the installation, using the same coordinated BlauTHERM system for the joint and the adjoining ductwork.

Connect the sections your installation needs, with the joint kept inside one matching insulated system.
The EPP coupler continues the matching insulated ducting system through the connection. Fully seated joints and the sealing required by the design help you complete the air path with care.
Measured routes need more than whole metres. A matching coupler helps reconnect duct sections cut to fit the space, so you can plan the actual lengths needed around the installation.
Choose the 125mm, 160mm or 200mm coupler specified for the adjoining ductwork.
Align clean, matching components and push the connection fully home.
The expanded polypropylene body keeps the joint within the insulated duct system.
Lightweight EPP is practical to carry and position along a planned route.
Add BTG-500 EPP adhesive where additional joint strength and rigidity are required.
Coordinate couplers with matching straight duct, bends, tees, reducers and supports.
Plan the couplers alongside the route and equipment, with the nominal size and available space checked before assembly.

Connect the insulated sections between compatible equipment and the connected ductwork. Match the diameter and layout to the ventilation design.
Keep matching insulated components together on suitable conditioned-air routes. The coupler forms the connection within the insulated system.
Join the matching sections needed for a suitable extract route, with clean, fully seated connections and support for the finished installation.
This listing is for the 125mm nominal size coupler. Match both adjoining BlauTHERM components to this diameter. The other sizes below are separate products for different routes.
This product
Insulated EPP coupler
BTIDC-125
Separate product
Insulated EPP coupler
Separate product
Insulated EPP coupler
Allow for the outside dimensions of the insulated duct, joints and fittings when planning the available space.
Prepare the matching components, complete the joint and support the finished route. Check the fitting instructions for your chosen connection arrangement.

Confirm the nominal diameter at both sides of the joint. A straight coupler joins matching sizes; select a suitable reducer for a designed change of diameter.
Keep cut ends square and mating surfaces clean. Check the required engagement against the fitting instructions before finalising a cut section.
Align the matching components and push them fully together. Maintain the insulation and any vapour sealing required by the installation design.
Use BTG-500 EPP adhesive where added strength and rigidity are required, following its application and curing instructions. Provide suitable support for the completed ductwork.
Use these product details alongside the route design and fitting instructions.
BTIDC-125 is the 125mm nominal size coupler for matching BlauTHERM insulated ducting and fittings. Check that both adjoining components are the specified 125mm size before ordering.
A matching coupler can help you use a duct section cut to suit the route. Check the required finished length and joint engagement, keep the cut square and clean, and fully seat the matching components.
The coupler is a joining component. Use it with the straight lengths and fittings needed to build the route; measure the installation and select the duct sections separately.
Use the matching connection arrangement for the selected BlauTHERM duct and bend. The coupler provides a same-size joint where required. Check the fittings and any connectors already allowed for in your route.
Confirm the nominal size, check the ends are square and remove loose debris from the joint surfaces. Align the components and follow the fitting instructions for full engagement.
Plan suitable supports for the completed ductwork and its joints. The coupler connects components; arrange the supports according to the installation instructions rather than relying on a joint alone to carry the run.
BTG-500 EPP adhesive is the matching option where additional joint strength and rigidity are required. Keep the surfaces clean and follow the adhesive application and curing instructions.
Choose the connector or reducer required by the actual route design. A 125mm straight coupler is for matching 125mm components; use the separate 160mm version for a same-size 160mm joint.
| EAN Number | 5056194058506 |
|---|